Posts

Rail to Barge transfer: Grain? Part 1

 I guess I never saw a good idea I couldn’t try to make better with dubious results.  We’ll see.  I wanted to model coal loading from hoppers to a River barge. My motivation for this was to make use of a fleet of foreign road hoppers I already owned (And purchased without thinking it through. I guess I’m the only modeler in the world who did that). So these fleets of foreign road hoppers, 87 Western Maryland and 54 Clinchfield*,  would bridge my layout and eventually end up at the River, where they would supply a loader. Fine, great. Plausible. Then I got into a discussion, with another modeler who shares similarly poor judgement,  about loading grain at my elevator. He postulated that in many cases grain loading was dictated by harvest rush periods, and that it might not be totally prototypical for my mill and elevator to be loading a relatively few car loads of one type of grain. Now, I pointed out, my elevator is not a collection elevator and not a terminal e...

Waybill Content: Commodities

 I use car cards and waybills (CCWB) to forward cars on my layout. Generally I use the system used by numerous other layout owners which I’d describe as “The Micro-Mark/Rail Graphics” system, for lack of a better term. Manila card stock folded up to create a pocket, in which the second half, the waybill, is held. These two pieces of paper make up the waybill. This “Waybill” directs the travel of cars on our layouts.  For example, a waybill reads: “Old Dominion Furniture: Lumber Door” Reading this, the switch crew brings this car to Old Dominion Furniture, the large building over there, with the big sign on it that reads “Old Dominion Furniture”. Once there the crew finds two spurs adjacent to the building, one labeled “loading track” and the outside track is labeled “Storage”. On the building there are five doors adjacent to the loading spur, numbered 1, 2, 3, 4, and “Lumber Door”. Can you guess where this car goes? Here’s my point. Does it help the switch crew to be informed ...

Documentation

 The word for today is Documentation. When I walk up to a job on a model railroad I want to understand what the layout owner expects of me. I MUST be in a easy to read and understand format.  Simple,  right? Like golf, there are only two simple things you need to master,  distance and accuracy. SIMPLE. Another question arises about Documentation on our model railroads. Does the layout owner go to the time and effort to produce instructions that will allow the guest operator to understand what he needs to do, or should the layout owner gear his documentation to his regular crew? As a guest operator I’m not happy when I’m faced with a job that I can’t understand. Usually it’s local geography, “Where does this car go?”. A recent layout I visited had clearly marked car cards and waybills (CCWB), but the YM was required to have a “better than average” knowledge of the Midwest and US geography. “It’s simple, Paul, cars billed to destinations east of Omaha go East, those de...

Building benchwork: plywood v dimensional lumber

  I have a couple advantages over a lot of other layout builders when it comes to benchwork. After that, not so much. On AIR1 I used birch plywood ripped into 2 1/2” strips, or 1x3’s. I am used to building out of 1x3’s because of what I did for a living. I owned the pneumatic nail/staple guns, chop saws, table saws, compressors, etc to easily put it all together, fast. I fully understand that many layout builders do not have the investment, at hand, in power construction tools I am still very much in favor of using plywood as opposed to dimensional lumber for benchwork. From time to time at my work, I was able to order some dimensional lumber of EXCEPTIONALLY good quality, that would have made great bench work material. But that was ALWAYS hit or miss. When I ordered lumber  I got what I got. I suppose I could specify better graded lumber, but in those cases the decision was always based on price. Also I ordered, generally, in full lifts. 144 - sixteen foot boards. With plywoo...

Transfers: accommodating crew members differing skill levels

 One of the problems I am admittedly overly concerned about is crafting jobs that can more easily accommodate different operators skill levels; the pace at which they accomplish tasks. Given an op session length of four hours some operators can switch 100 cars, while others can switch 10 cars. Both have fun. One has greater “through-put”. What I don’t want is for one guy to finish in two hours and have to sit around, while the other is busy,  happily switching cars,  but by the end of the session has left 90 cars in the yard, un-touched. So I adopted the idea of transfer runs to allow each operator to draw additional cars, at his own pace. What I was missing was a timing procedure. I believe I found it last weekend. I was operating the Paper Mill job on Jim Rogers B&O Charleston Div. Layout. Jim has a series of card boxes at the mill. They have various labels, which I do not specifically remember, but something like: Spot Processing  Working Filing paperwork Pick...

Bad advice

  When I built AIR1 I took some bad advice. Quite a bit in fact. Most of it turned out to be VERY costly. Today’s “Rant” is about gluing track, which I was promised would be the very best way to build my layout. This turned out to be the single most costly piece of advice I took when building AIR1, and now after some research I have found it wasn’t only bad for me.   I was strongly advised to glue my track down with DAP Brand adhesive caulk. Gluing track down allows you to get a lot of track down FAST.  If you use push pins and a straight edge, your tangents can be made VERY straight. In yards I cut a spacer that I used between tracks. First I laid the first track using the straight edge, then slipped the spacer block in and butted the next track up to that. Yards went down fast and straight. I was, and to be honest am still very happy with the results of my track laying. Laying track using DAP Brand adhesive caulk is very forgiving during the actual installation process....

Train 93-94

 I am modeling a train that, due to my track work, must change direction. A train out of “South” staging running west to Littlerock yard then turning and running east all the way across my layout. On a map of the eastern USA this train would be running west to east. Within the confines of my basement it runs west THEN east. The “EAST” leg of this train will be #93-94. The “WEST” leg will be #95-96. It will primarily carry LCL and produce from the Southwest to the Northeast. On the return it will carry LCL. I am assured that there are numerous examples of this happening on the prototype.