Posts

Tank Cars

 We live in a golden age for modeling. Everyone that says, “Oh remember the good old days” is drunk.  We’ve got a myriad of new product, in ever increasing detail. Admittedly, it’s all getting ever increasingly EXPENSIVE, but as Andy Sperandeo once told me, “Paul, this hobby isn’t expensive, it only costs all you have”. -BUT- I digress. For a long time, as a steam era modeler I was jealous of the tank cars available to modelers of the contemporary era. Not now.  Starting, YEARS AGO, with P2K and their type 27  8k Gal. & 10k gal. tank cars, then gradually a ton of tank cars became available in my era. Industries I model now can have an appropriate type of tank car billed to them. Acid tank cars, insulated, radial course, LP, three dome, the list goes on. What was missing was a model of the X-3. Arguably the single most numerous tank car of the Steam era, the X-3 was exclusively operated by UTLX (Take that! Mike Peters). It still makes up nearly 10% of the North Am...

Auto Parts Traffic

 In my era Finished automobile traffic is minimal, but parts traffic is still a big part of railroading. On my railroad my auto parts traffic goes in train #98. Train 98 traces its route from Detroit to Atlanta and carries auto parts to assembly plants around Atlanta. I am a Ford guy, and wanted to express this on my layout with Train #98.  -However- As it turns out, in reality Ford did not have plants near Atlanta, but,  for my purposes,  around Richmond Va. -SO- My train #98 is going to have to set out a large block of Ford Auto parts in Littlerock. “Ninety-Eight” will probably fill tonnage with preferred LCL  and head off South, eventually into South staging at Deepwater JCT. The Ford Block will have to go into the next available expedited train going to/towards Richmond. I do not know my actual schedule off hand so I can’t say what train that will be. I don’t think it would be unreasonable to have this auto parts block get added to a perishable meat train. F...

Opening boxes: part 2

 I just had total knee replacement surgery in my right knee. In mid May I’m am scheduled to have the left knee done. 2023 is pretty much shot. About a week ago I was able to climb the basement stairs and I’ve been going down there daily. My plan is to sort boxes. We moved into this new house on Feb14 of last year. I have spent the last year doing the myriad of things that needs to get done to move into a new build house. So now, since about all I can do is sit and sort, that’s what I’m doing. Trains, personal stuff. You know the collected junk of a lifetime. Right now I’m filling a trash barrel a day. So I’m opening boxes. Man! A ton of Stewart F-units! Lots of structure kits. But the big surprise  was a box from an estate sale, 30 brand new, in the original box, Tortoise switch machines. Not 100% sure where I got those, but here they are!

Room Prep: a LOT to do

 Our basement is a blank canvas. Because in our original plan I was NOT going to put the layout in the basement I made the short sighted decision to make the ceilings only 8’.  The benefit to doing this was that the process of plumbing and wiring the house was made simpler. Since I actually built this house the lower ceiling made all the mechanical work a little easier, not a bunch of ladders and low scaffold. Physically I was running out of time. My knees were shot out by then, so what ever I could do to get the house done, we did. I’m now taking 2023 off to get both my knees replaced. Ugh. As per building code the concrete walls needed to be draped with an insulation blanket, which I did. What I want to do now is put a wall in front of that blanket. If I stud floor to ceiling with 2x4’s, flat, 2’ on center, and over that some sort of board, I’ll attach the layout to that. Originally I was thinking drywall. However I’m now thinking of OSB plywood. It’s cheaper that drywall cu...

Freight House Operations: New thoughts on LCL waybills

 On my new layout, AIR2, Freight House operations are going to be a large part of the game. Up until relatively recently I had planned to use waybills to simulate LCL packages. So if we take the Transfer Freight House for example, it’s planned to get 48 cars spotted at the beginning of each session. This initial 48 cars is supposed to get pulled over the course of the session and a final 48 cars get’s re-spotted there. That’s 96 cars. If I place multiple LCL waybills in the card pockets of each cars car cards, it would be roughly four bills per car; 368 waybills, representing LCL loads. The crew would pull all these inbound bills, sort and collate them, then reload them into boxcars by destination. In practice this turned out to be AT BEST, a nuisance, and more often than not, unworkable. The idea was to simulate the movement of LCL packages. It overwhelmed the operators. What I failed to take into consideration was the scope of my operation. The “Freight House” job had something l...

Liquidating Estates-A labor of love?

 I’m 62, and like most of you, getting older by the SECOND. And like every one of you you have a ton of friends who have relatives that are modelers, but they, themselves are not. When their fathers or grandfathers, or husbands pass away your friends come to you, because you’re a train guy, you know EVERYTHING. I swear, if you want to get back at your wife, take that one last parting shot from the grave, then have a huge train collection coupled with a huge layout. Your heirs are SCREWED! So several years ago I get a call from a friends wife, can I help. She has to be out in 30 days, and her husband has a 40 x40 purpose built building with a layout and a collection spanning four scales! I packed the entire thing up and sold it all off at swap meets. I think I got her $15000 in cash over two years, which amounted to about 30 cents on the dollar.  While I’m collating all this stuff, and what modeler doesn’t have enough “Project” cars to last three lifetimes, I end up with a ton ...

Rail to Barge transfer: Grain Part 2

 To over simplify there are only a handful of bulk commodities that get loaded on River barges: Coal, grain, limestone, some ores, and petroleum. I have discussed previously that I chose to move the western end of the MODELED PORTION of my layout to Charleston, WV., because it allows me to take advantage of the proximity of rivers to the railroad. I get to model my rail to river barge transfer operation. For a long time I have been planning to model only a coal transfer. The idea of the coal transfer was simply to utilize a large fleet of foreign road hoppers. I understand that is not the best reason to do this, but it’s my reason, so there… Several friends and I have been discussing this and they, as usual, want to do more. It is my experience that LESS is actually more, but I am interested in branching out and including grain.  There are always problems associated with things like this, grain barges are, as a rule covered, while coal barges aren’t. Otherwise the transfer sys...