Posts

Pettigrew Doughnut

 Those of you that operated on AIR1 are familiar with Pettigrew yard. For those new to the Atlantic Inland the coal marshaling yard is Pettigrew Yard. Coal hauling railroads often had a yard dedicated to processing coal hoppers from various branches and building trains that forwarded coal on to it’s final destination. For the Western Maryland this was Knobmount. On the C&O it would be Hinton, on the N&W, Bluefield. Clinchfield’s was at Dante. On the Atlantic Inland it’s Pettigrew. Coal loads picked up from various loaders, tipples and mines make their way to the marshaling yard, traveling on a “mine tag” for paperwork. Once at the marshaling yard loads get weighed, classified, and receive billing and permanent waybills(1*). On AIR1 I simulated this billing change with two sided waybills. One side was the mine tag which simply routed the car to Pettigrew Yard. Once the PYM began classifying these cars HE would flip these bills and reinsert them 8n the card pocket. Once flip...

Reefer Ops: Express Reefers

 Located at the west end of the layout is main west staging, divided into two sub staging yards: St.Louis and Chicago. Additionally there will be three staging yards representing the three connecting railroads: B&O, C&O, and NYC. AIR passenger trains will originate from West Staging. These passenger trains will feed a handful of cars to the passenger service facility: REA, USPS, Pullman Service, various industries, etc… These passenger trains will not, I think provide enough work for my passenger job, so I am planning three passenger transfers from the connecting roads, one passenger transfer from each of these connecting road staging yards. These transfers will be made up of several of each type of head end car(1*),   billed to various spots in the passenger jobs area of responsibility (From time to time there will be a passenger car in these transfers, making a connection, but that is for another discussion). If, as I expect, each transfer consists of at least ten ca...

Reefer ops

 It’s been a while. I’ve had a couple things that have side tracked me. My knee rehab. I am falling behind. Doing my two knees so close together, 14 weeks apart, makes the rehab seem like one long slog. I find, at PT, that I’m falling behind. So I have to be more diligent. Secondly, Murphy has, in quick succession, shredded the two train books I was reading. I’ve re-ordered them, but I’m waiting.  The third book, about produce reefer traffic, has to be locked away from Murphy when I’m not there guard it. I’ve been discussing reefer ops with my friend John Fiscella. John is one of the big movers and shakers at the San Diego Model Railroad Club. They are located in the Balboa Park museum in San Diego, Ca., across the hall from La Mesa. In my era, ice bunker reefers were how the railroads moved produce. The Reefer operators, PFE or SFRD to name two examples, offered what are known as “Protective Services” along with the transportation of goods. Protective services are everything ...

Halstead Brick Co.

 On AIR1, located in the area of the layout I called “Athol” was the Halstead Brick Co. this was one of the few fairly nice, and complete models on the layout. Halstead Brick had a nice company office, a coal trestle for receiving loads of coal and coke in 50 ton hoppers. There was a couple beehive kilns and a long spur for loading pallet-ized brick into boxcars. Finally there was ground cover(!) and ballast, something not common to AIR1, which was mostly painted plywood and Kraft paper and plaster cloth mountains painted green. Halstead Brick manufactured two colors of brick, yellow/tan and red. There were a lot of pallets of brick, and I think a fork lift as well.  In addition there was a team spot on the lead to the brick yard where pulp wood was loaded onto pulpwood racks. This industry was located in an odd spot, on the inside of a curve at the closed end of a peninsula. When the local was switching Athol he had to cross the main to get to Halstead Brick, but in general t...

Federal Pacific Electric

 My Dad came back from the great WWII in 1946. He arrived at Alameda Naval Air Station in a C-54. He was the oldest son and single. The rest of the Family, brothers Frank and John, and sister Anne, by this time ALL married, agreed that he should be the one to take care of his Mother. Reluctantly he agreed but told everyone “The day she dies I’m leaving for California”. On Easter Sunday 1948 my grandmother passed away, Dad was on a train Monday afternoon. Dad got a job with Federal Pacific Electric Co. shortly after his arrival in California. FPE had a factory and headquarters in Newark, NJ, but Dad began at the plant in Glendale, Ca. He met my mother in 1954, married her in 1955 and continued with FPE, but split time between the facility in Glendale, and South San Francisco. They moved into the house I grew up in in 1960. With respect to AIR1 & AIR2 FPE had a factory in eastern Tennessee.  I moved that factory 150 miles to the north so it would show up on my first layout, ...

Time-Table

 I chose to use TTTO to control traffic on the AIR. When you do that you must have a time-table. I used prototype time-tables (TT) as my template. I used Word to design and print my TT. Everyone, and I mean EVERYONE recommended I use Excell, but I had already put in the time learning Word and was happy with the results and my ability to produce a TT document. The TT went through numerous up grades, I think we ended up with TT#18 on the last few months of operation of AIR1 (TT#1 through TT#18 in ten years). The primary reason for so many changes was that I started with SO MANY trains on the schedule, and gradually reduced them over time(*1). I believe I started with 25 or 30 trains on the schedule and ended up with 12. At first it was like killing off my children, kicking trains off the schedule. Passenger trains were really hard to eliminate. By the last few years I learned to relish “Train-offs”. I think on AIR2 I have 12 trains on the TT.  What information needs to be in the...

Wingedfoot Paper: Part 4

 I always wanted a Western Maryland presence on the layout. This idea was copied directly from Tony Koester’s Allegheny Midland. After spending some time with a railroad Atlas I could readily see why Tony chose Durban as his eastern end point. It connected end to end  with the WM. On AIR1 I made the connection poorly. I chose Webster Springs for my connection because I liked the name. WM trains connected with the AIR at WM  in Webster Springs. There was no area where a WM switcher worked however. WM trains just continued over the AIR, traveling over the entire layout until they exited off-layout into West Staging. I did not like all this run through power. I’m planning a strict separation between WM and AIR, and putting an end to all those run through trains. However on AIR 2 I’m planning to build a length of parallel track, WM/AIR, and put the Wingedfoot Paper plant on the WM. WM trains will enter the layout at the extreme east end of the layout. They will either, most o...