Posts

Room Prep: framing and drywall

 I built my house. My wife and I drove every nail, every piece of siding, all the electrical, drywall, insulation, mounding, paint and plumbing. I swear, I’ll never hire that plumber again! Anyway, our original plans were for a stand alone train building. But we both got “Severe Construction Fatigue” so, by mutual consent, I got the basement for the train room. It’s 2000 sq ft. Right now it’s full of junk which we are sifting through, slowly.  In addition my knee surgery has kept me upstairs for the first six months of this year.  We did get a very small leak in a fitting under the master shower, and because it was way on the far side of the basement, and because we didn’t go down there much anyway, this small leak just dripped, unremarked, for weeks. It’s doubtful something like that will happen again. I don’t mean we won’t get another leak, it just won’t go unnoticed for weeks again because I’m in the basement a lot more often now.  Still it scared me away from car...

Mistakes

 None of you are going to believe this, and no matter how often I tell you you’re all going to lose sleep, but the vast majority of the mistakes you make building your layout are NEVER going to show, and no one is going to notice them. I promise you my mistakes have been seen by far more people than you’d guess. More often it’s when things go right that the problems start.  I get it. Me telling you not to worry isn’t going to magically make you stop worrying, but STOP WORRYING ABOUT IT!  Nine times out of ten it’s going to get covered up, and the tenth time no one will notice. BELIEVE ME. What’s more important is developing the ability to progress in spite of things going wrong. Call it “problem solving”. As you add tricks to your bag while working, each new problem will become less and less of a pain.

Turntables

 I model 1952 and will use my “good” running Steam locomotives for coal operations. What this will mean is turntables! I’ll need turning facilities. Interestingly the engines I’ll be using for my coal trains, USRA Y Class 2-8-8-2’s won’t fit on any of the 90’ turntables I own. I’ll be turning those engines on a Wye. But I want the 90’ turntables to turn diesels: they will accommodate two F-Units, so an A-B set can be turned. These 90’ turntables will act as a reminder of the steam era past on my layout, and if and when I steamilize  then these turntables will come in handy. Now as to the turntables themselves, on AIR1 I had one turntable, at Littlerock engine service. It was an “Armstrong”(1*) version. That is, you turned it with your hand. It was not indexed, had no motor, no electronics. You drove the engine up on the turntable, turned the bridge, lined it up with the Mark 1 Eyeball, made sure the polarity was correct, and that was it. The way polarity was aligned was the do...

Pettigrew Doughnut

 Those of you that operated on AIR1 are familiar with Pettigrew yard. For those new to the Atlantic Inland the coal marshaling yard is Pettigrew Yard. Coal hauling railroads often had a yard dedicated to processing coal hoppers from various branches and building trains that forwarded coal on to it’s final destination. For the Western Maryland this was Knobmount. On the C&O it would be Hinton, on the N&W, Bluefield. Clinchfield’s was at Dante. On the Atlantic Inland it’s Pettigrew. Coal loads picked up from various loaders, tipples and mines make their way to the marshaling yard, traveling on a “mine tag” for paperwork. Once at the marshaling yard loads get weighed, classified, and receive billing and permanent waybills(1*). On AIR1 I simulated this billing change with two sided waybills. One side was the mine tag which simply routed the car to Pettigrew Yard. Once the PYM began classifying these cars HE would flip these bills and reinsert them 8n the card pocket. Once flip...

Reefer Ops: Express Reefers

 Located at the west end of the layout is main west staging, divided into two sub staging yards: St.Louis and Chicago. Additionally there will be three staging yards representing the three connecting railroads: B&O, C&O, and NYC. AIR passenger trains will originate from West Staging. These passenger trains will feed a handful of cars to the passenger service facility: REA, USPS, Pullman Service, various industries, etc… These passenger trains will not, I think provide enough work for my passenger job, so I am planning three passenger transfers from the connecting roads, one passenger transfer from each of these connecting road staging yards. These transfers will be made up of several of each type of head end car(1*),   billed to various spots in the passenger jobs area of responsibility (From time to time there will be a passenger car in these transfers, making a connection, but that is for another discussion). If, as I expect, each transfer consists of at least ten ca...

Reefer ops

 It’s been a while. I’ve had a couple things that have side tracked me. My knee rehab. I am falling behind. Doing my two knees so close together, 14 weeks apart, makes the rehab seem like one long slog. I find, at PT, that I’m falling behind. So I have to be more diligent. Secondly, Murphy has, in quick succession, shredded the two train books I was reading. I’ve re-ordered them, but I’m waiting.  The third book, about produce reefer traffic, has to be locked away from Murphy when I’m not there guard it. I’ve been discussing reefer ops with my friend John Fiscella. John is one of the big movers and shakers at the San Diego Model Railroad Club. They are located in the Balboa Park museum in San Diego, Ca., across the hall from La Mesa. In my era, ice bunker reefers were how the railroads moved produce. The Reefer operators, PFE or SFRD to name two examples, offered what are known as “Protective Services” along with the transportation of goods. Protective services are everything ...

Halstead Brick Co.

 On AIR1, located in the area of the layout I called “Athol” was the Halstead Brick Co. this was one of the few fairly nice, and complete models on the layout. Halstead Brick had a nice company office, a coal trestle for receiving loads of coal and coke in 50 ton hoppers. There was a couple beehive kilns and a long spur for loading pallet-ized brick into boxcars. Finally there was ground cover(!) and ballast, something not common to AIR1, which was mostly painted plywood and Kraft paper and plaster cloth mountains painted green. Halstead Brick manufactured two colors of brick, yellow/tan and red. There were a lot of pallets of brick, and I think a fork lift as well.  In addition there was a team spot on the lead to the brick yard where pulp wood was loaded onto pulpwood racks. This industry was located in an odd spot, on the inside of a curve at the closed end of a peninsula. When the local was switching Athol he had to cross the main to get to Halstead Brick, but in general t...