Ops weekend: The New Jersey Highlands

 If you’re reading this chances are good that you’re familiar with the concept of “Ops Weekends”. On the odd chance you’re not the basic idea is that a group of those of us who reside on the lunatic fringe of society travel to a city or region where a group of other layout owners, other residents of the fringe, live.  They host us at op sessions on their home layouts. Layout owners seem to like this idea because it gives them a chance to show off their layout to a larger group of people with a common interest. Now years ago these were temperate affairs with punch and cookie refreshments. Of late it seems Rule G(*1) has been suspended, and in many cases trampled upon.  So some time ago I investigated the possibility of bringing a group of friends to the layouts known as “The New Jersey Highlands”. These layout owners were quite organized and had one amongst them who acted as coordinator, Ted Pamprin.  He replied to my request in the affirmative; They were receptive to...

Space for a layout: building more room

 For my ENTIRE life every model magazine has been filled with articles devoted to utilizing available small spaces for a layout. I think I’ve read one, ONE, article devoted to building a larger space. I’ve been in construction for more than half my adult life, 32 years, and I think building a larger space is easier than settling for a small one. This is our hobby. For most of us we are not spending thousands of dollars on other interests. Additionally if you add a room, that room will appreciate in value, and pay you back after you built it, when you sell it. For example I built a building for my layout in Burbank, Ca. It was a four car garage with a second floor devoted to the trains. That room was 1230 sq ft. The real estate agent valued that room alone at $100,000. The garage in questioned had actual space for two cars, a laundry room, a wood work shop, a train work shop, a garden tool storage area, and a half bath. That was the first floor. The second floor was the train room. ...

Room Prep: framing and drywall

 I built my house. My wife and I drove every nail, every piece of siding, all the electrical, drywall, insulation, mounding, paint and plumbing. I swear, I’ll never hire that plumber again! Anyway, our original plans were for a stand alone train building. But we both got “Severe Construction Fatigue” so, by mutual consent, I got the basement for the train room. It’s 2000 sq ft. Right now it’s full of junk which we are sifting through, slowly.  In addition my knee surgery has kept me upstairs for the first six months of this year.  We did get a very small leak in a fitting under the master shower, and because it was way on the far side of the basement, and because we didn’t go down there much anyway, this small leak just dripped, unremarked, for weeks. It’s doubtful something like that will happen again. I don’t mean we won’t get another leak, it just won’t go unnoticed for weeks again because I’m in the basement a lot more often now.  Still it scared me away from car...

Mistakes

 None of you are going to believe this, and no matter how often I tell you you’re all going to lose sleep, but the vast majority of the mistakes you make building your layout are NEVER going to show, and no one is going to notice them. I promise you my mistakes have been seen by far more people than you’d guess. More often it’s when things go right that the problems start.  I get it. Me telling you not to worry isn’t going to magically make you stop worrying, but STOP WORRYING ABOUT IT!  Nine times out of ten it’s going to get covered up, and the tenth time no one will notice. BELIEVE ME. What’s more important is developing the ability to progress in spite of things going wrong. Call it “problem solving”. As you add tricks to your bag while working, each new problem will become less and less of a pain.

Turntables

 I model 1952 and will use my “good” running Steam locomotives for coal operations. What this will mean is turntables! I’ll need turning facilities. Interestingly the engines I’ll be using for my coal trains, USRA Y Class 2-8-8-2’s won’t fit on any of the 90’ turntables I own. I’ll be turning those engines on a Wye. But I want the 90’ turntables to turn diesels: they will accommodate two F-Units, so an A-B set can be turned. These 90’ turntables will act as a reminder of the steam era past on my layout, and if and when I steamilize  then these turntables will come in handy. Now as to the turntables themselves, on AIR1 I had one turntable, at Littlerock engine service. It was an “Armstrong”(1*) version. That is, you turned it with your hand. It was not indexed, had no motor, no electronics. You drove the engine up on the turntable, turned the bridge, lined it up with the Mark 1 Eyeball, made sure the polarity was correct, and that was it. The way polarity was aligned was the do...

Pettigrew Doughnut

 Those of you that operated on AIR1 are familiar with Pettigrew yard. For those new to the Atlantic Inland the coal marshaling yard is Pettigrew Yard. Coal hauling railroads often had a yard dedicated to processing coal hoppers from various branches and building trains that forwarded coal on to it’s final destination. For the Western Maryland this was Knobmount. On the C&O it would be Hinton, on the N&W, Bluefield. Clinchfield’s was at Dante. On the Atlantic Inland it’s Pettigrew. Coal loads picked up from various loaders, tipples and mines make their way to the marshaling yard, traveling on a “mine tag” for paperwork. Once at the marshaling yard loads get weighed, classified, and receive billing and permanent waybills(1*). On AIR1 I simulated this billing change with two sided waybills. One side was the mine tag which simply routed the car to Pettigrew Yard. Once the PYM began classifying these cars HE would flip these bills and reinsert them 8n the card pocket. Once flip...

Reefer Ops: Express Reefers

 Located at the west end of the layout is main west staging, divided into two sub staging yards: St.Louis and Chicago. Additionally there will be three staging yards representing the three connecting railroads: B&O, C&O, and NYC. AIR passenger trains will originate from West Staging. These passenger trains will feed a handful of cars to the passenger service facility: REA, USPS, Pullman Service, various industries, etc… These passenger trains will not, I think provide enough work for my passenger job, so I am planning three passenger transfers from the connecting roads, one passenger transfer from each of these connecting road staging yards. These transfers will be made up of several of each type of head end car(1*),   billed to various spots in the passenger jobs area of responsibility (From time to time there will be a passenger car in these transfers, making a connection, but that is for another discussion). If, as I expect, each transfer consists of at least ten ca...