Posts

Helpers Part Four

 On AIR1 Helper operations were a central theme on that layout. I had a grade, 85’ long, that connected the two decks. It was long, relatively straight, and open the entire way.  On AIR2 there will be two helixes (Heleces?). Helper engineers will not be able to stay with, or see their trains. The trains will be for the most part, concealed within the helix. I seriously considered adding helpers to the head end only, and consisting these two power sets as necessary. This necessitated the purchase of a new command control system, one that made consisting easier on the fly. After some discussion recently I arrived at another conclusion, one that requires me to set a scenario. Eastbound AIR trains depart Huntington, West Virginia, which is not part of the modeled portion of the layout, and make their way up river to Charleston, which is the western most portion of the modeled layout. At this point power and caboose are swapped. Charleston represents a division point, and is the be...

Op Session yesterday and waybills

 I went to an op session yesterday at Rich Steinmann’s Erie-Lackawanna Morris and Essex division layout. I have to say I had a great time. I was able to physically finish the session, which for these days is always nice. But I got a good job and was kept busy and challenged for the session.  Specifically I ran the Morristown and Essex switch job, the M&E switches a town, waits for an interchange from the EL, and switches a bit more. I got a long look, for the second time, at Rich’s car cards and waybills and I’m fairly sure I’ll be stealing his template. His layout is set in northern New Jersey. Railroads in this area are packed close together and cross often. It’s this type of railroading that lead so many railroad historians to comment that America’s railroad industry was over built. Out West, where I’m from, tracks are generally few and far between. Here in the industrial east, each hamlet has four different railroads serving it. It’s no wonder there was an impression o...

Damned if you do and damned if you don’t

 Several years ago I attended an ops weekend and I want to concentrate on learning clerks jobs. I chose my layouts based on a layouts clerk job, and I made a big effort to make sure everyone attending could have the clerks job if they wanted it, or we could split it. I volunteered to forgo taking the clerks job if anyone else wanted it. What happened was at each layout no one else expressed a desire to have the clerks job. Great! After the ops event it got back to me that a number of people complained that I got the clerk job at each layout, and that it was unfair that I had done this. I had made a big effort to give anyone who wanted the clerks job the opportunity to take it. No one stepped up. It appears that when I sincerely offered to pass on the clerk position, everyone assumed I had strong-armed my way in and they didn’t want to step up and be the person to take that position away from me. My feelings were hurt, and I have never returned to this region for an ops event si...

Detailed drawings: Part One

 I spent the free time I had in the last couple days drawing detailed plans of all the yards and switching districts on the new layout. I am a graph paper, pencil, ruler, and eraser guy. No cad. Mistakes are erased, or when large enough, like omitting the entire third track through the west end of the layouts urban area, a cause to re-draw the entire thing.  I have templates, downloaded from the internet, of most turnouts, so I can allow the correct amount of space. Walther’s on-line catalog has most of the footprints of the structures they carry, and I use these in nearly every case, to help with layout.  I like kitbashing structures, so many times the exact footprint won’t work. Usually I allow a generous amount of space for a footprint. After doing this a few times wrongly, on AIR1, I got pretty good at doing it right. There is always going to be a mistake somewhere.  In those cases something has to go, usually track. I’ve made a rule that aisle space is never to ...

Storage tracks

 I am a free lancer. These days that is generally scoffed at, but I am a proud free lancer. I sincerely try to make every facet of my layout prototypically plausible.  -BUT- Because I’m a free lancer I am not constrained by the prototype. With this in mind whenever I establish an industry on my layout I try to include as much operation as plausible.  To cut to the chase  every medium sized, or larger, industry on my layout has a storage track adjacent. The idea is the storage track holds MTY cars so there is a buffer of available MTY’s for the particular industry. On AIR1 at Old Dominion Furniture the storage track held about eight 50’ furniture boxcars*. Then the local would pull and spot cars for loading from the storage track, and set out MTY for loading cars on the storage track. It gave the local an extra move to make. The local would show up with four cars, spot two, re-spot two, and pull two for a total of six cars handled.  Last week in Southern Californ...

SoCalOps

 I flew to Southern California last weekend to participate in SoCalOps. Way back in the mists of time I hosted op sessions for SoCalOps. It’s been a LONG time and I wanted to see the layouts. In fact I chose layouts I’ve never been to before. The funny thing is, I’ve known all of the layout owners for probably between 30 and 40 years. Al Daumann is the driving force behind SoCalOps, in fact when he first suggested the idea I told him I wanted NOTHING to do with the organization of the event, but that I would host as many sessions as I could over the long weekend. My first layout was actually a bonus session on Thursday afternoon. It was an outdoor G-Scale layout and I must say it was excellent. I had a lot of fun. My first selected layout was at Clark Bauman’s. I’ve known Clark at least 40 years. We used to live only a few blocks from each other and I regularly ran into him railfanning Burbank Jct.  -BUT- In all that time I’ve never been to his layout. Clark models the SP over...

Freight Agent/ car distributor :part one

 The idea is to creat a position whose responsibility is car utilization. He would receive some instructions at the start of the session like: 1) The apple warehouse needs 20 reefers. 2) The Flour Mill needs clean 40’ boxcars Etc. He might also receive several MTY car requests for one car. He would scan the industries around the layout. At one small town there might be a boxcar that has been released by an industry at one end of town, matched by a request for a car at the other. He would write a switch list instructing the local to pull the car from industry “A” and re-spot it at industry “G”. Also while scanning he might find several reefers that are MTY, which he would then bill to the clean-out track, and eventually these reefers would make their way to the Apple warehouse for loading. My guess is he would have blank bills that he would hand-write to re-direct the cars in question. There could be a bulletin instructing him to send MTY 40’ boxcars off-layout West for grain loadin...