Posts

What did Santa bring?

 Let me start this off by stipulating that, for the most part, none of us NEED any more trains. For example, ME. I believe I own somewhere in the neighborhood of 75 covered hoppers. So this Christmas Santa naturally brought me six NYC covered hoppers from Rapido. The more Hoppers, for example, I get the larger the fleet becomes, the more diluted the cars get, submerged in the thundering herd, the less noticeable a cool new model actually becomes.   Let’s say I picked up fifty (50) coal hoppers some Christmas. All painted and lettered for the AIR with different numbers. If that happened tomorrow the fleet would only grow by 1/8 or roughly 12.5% . If it was to happen again the next day, another fifty cars. That would only grow the fleet by 11.1%. So what is the real lesson here? Next time you are considering buying more coal hoppers (Or in fact any car type),   buy 100 at a time. So what did Santa bring YOU?

Quick addendum to Freight House Traffic

 I did a quick calculation of the number of cars that will cross the layout between freight houses, each session. 68. Obviously this is a lot, and what I foresee is that some of these cars will not move every session. Additionally I’m not actually sure that these cars will make their trip in one session. I’m assuming that some cars,  for various reasons, will dwell in a yard, having missed a connection. Others will get in trains that will, for whatever reason, fail to complete their run, or not get worked upon arrival. This leads to the question if say 25% of the cars are still in transit when I re-stage, will this cause a glut? So do I need to not only check the various car spots at originating freight houses, but do I need to take a look at yards and trains in transit, and get car counts from there? Slow handling one session, followed immediately by a second session of fast transit times might yield 125% car spotting’s in the second session. On AIR1 I simply left these situa...

Freight House Operations and LCL

 It’s no secret that I think LCL Operations should be a large part of every Steam Era layout, I’d say any layout set in the era 1900 to 1970. What I’ve found is that the majority of layouts featuring LCL do not use separate LCL bills. I will not either.  My LCL Ops will feature something in the neighborhood of 200 cars in a session. With that number of cars I think it would be unworkable to ask the operator to deal with multiple waybills with each car. I think I’ve described it as “moving cars, not bills”. I think the operator will get the idea. I would like to have the Freight House Job have a peddler car or two to prepare for the local, but again I’m not sure what’s the best way to accomplish this. I’m thinking that it might be best to fill this cars card pocket with the individual LCL bills during staging, as opposed to having bills come to the freight house via individual cars, and having the Freight House Foreman pull and collect these bills during each session. -BUT- The...

Complex Switching plans

 We hear this over and over again, the prototype does not like complexity. Neither in is procedures nor its physical plant. Expensive and complex track arrangements installed to serve a customer,  that might reasonably receive one car per week, are simply not going to happen.  This is absolutely the opposite of what model railroaders, in fact, do. I’m getting tired of hearing, “But this was what the prototype actually did”, to explain a switchback that only accommodates one small engine  and one car, needed to reach an industry receiving 24 cars.  I must be the only person who thinks that these operations are an annoying nuisance, and are no fun.  I’m sure most of my readers, who probably have MUCH better things to do, are familiar with John Allen’s  “Time-Saver” switching plan.  While this is an enjoyable game, I do not think it was designed to be part of a layout. Traveling through a complex system of switch-backs in order to spot two cars at a ...

Prep Plant Part 4: A good idea who’s time has not come

 “People wed their ideas with far more devotion than their wives or husbands”. I was devoted to the idea of a coal prep plant. I’m still not ready to abandon it completely, however, it will not be making an appearance on AIR2 as it was designed and discussed all along. Here are my reasons for dropping this idea.  Manpower. This idea would require more operators, at least one additional permanent crewman.  Space. This idea would require a significant amount of space. Now let me explain this a bit further. I HAVE the space on the layout plan. What I don’t have is the floor space. The crew working the prep plant would be occupying the same floor space, for the entire session, as crews working other industries located on DIFFERENT levels of the layout. I’ve made this mistake before, two crews working industries directly above or below each other. NEVER AGAIN. Additionally I could not figure out how to make the prep plant work for the entire session. Because this is an HO scal...

Interchanging Cars between Layouts

 Several years ago I had the privilege of attending a Pro Rail event in the region around Detroit. While there I was made aware of a round robin group made up of contemporary era layouts, led by Bruce Carpenter*, representing various different roads. Each of these layouts had numerous points of interchange between other layouts.  So far this idea seems fairly mundane, except this group chose an interesting solution to interchanging these cars. If you, for example, had a UP layout that interchanged with the BNSF, you routed cars for BNSF to the appropriate staging yard on your layout. Upon the completion of your op session, you packed up the cars for the BNSF into a box, and sent them, via UPS, to the BNSF layout in the round robin group. The BNSF sometime between sessions, received a box from you, unpacked it, placed the cars on the layout, and forwarded them as per their waybills. If you were a CN layout, and you had cars for a DRGW layout, but did not directly connect, you m...

Secondary Passenger Trains (For lack of a better term)

 I have a 24-Hour Schedule. I run a 1-1 Clock. It would take a 24-Hour Session to run my entire schedule in one day. Each session is four hours of that schedule. It takes six sessions to equal a full day.  Does any of that make sense? Anyway…  two passenger trains (or is it four?), #1& 2 and #15 & 16, are scheduled at nearly the same time of day on my schedule in order to place them at the passenger terminal at the same time. The reason for this is because these trains exchange so many cars. So #1 and #15 are on layout at the same time, and #2 and #16, the same. Each pair run roughly 12 hours apart. Because of this there are op sessions where there are no passenger train running at that moment in time. The passenger terminal job, The Passenger Terminal Foreman, is a bit light at those times.  It’s because of this I created several passenger trains that must be built, but that simply run from the Passenger terminal, WEST, into staging. They do not run across t...