Posts

Layout Geography: Update

 I think in the first week of my blogging I wrote about the geography of my layout. Additionally I covered my decision to move the modeled portion of my layout to Charleston, WV a year or so later.  I thought after a couple years I’d go over it again. What I mean by layout geography is, “Where in the world is my layout located?”. I think the answer to this question is actually one of the top three or four questions you must answer when building an operations oriented layout. Frankly I cannot, off hand, think of anything more important, even though I’m sure there is something. Where you are determines your traffic plan. Your traffic plan practically dictates everything else you’ll do. What kind of trains will you run? Your car and locomotive fleets. What else? I spent a GREAT deal of time with railroad atlases and determined where my railroad would go; connections to be made; traffic plans; logically what trains I’d be running over my layout. I made a decision that I WANTED a r...

Where did the Coal go, and why? Part 2

 Something I wanted to add to this, in the Steam era it’s important to remember that the Railroads themselves could NOT set rates. A railroad could not charge more if they could get a product somewhere  faster than their competition. They could not charge LESS either.  Of course, as a shipper, you knew it was going to cost you $10 a ton to ship a car load of widgets to Peoria, but Railroad B could get them there two days faster. This might be an inducement. If the All-Rail route saves you the demurrage charges because your widgets are in those cars five days LESS than other routes, than that might be an inducement. If, on the other hand, you could move your widgets to Boston for $8 a ton, but part of the trip was in an inter-coastal freighter that was going to take a week longer, Is the delay going to be a problem ?  If it isn’t,  then that’s the routing you’re going to choose. It’s the way the routes are sewn together. The all-rail route, no matter which way yo...

Where did the coal go and why?

Let’s start this whole thing off by stipulating that I am talking about the Steam Era, and in every case prior to the Staggars Railroad Deregulation Act of 1980.  I’ve been trying to find out where so called Tide Coal went and why.  A great deal of coal mined in the Appalachian Coal Fields went to piers at various east coast ports where it was loaded into ships and barges. A large percentage of this coal was exported overseas. A great deal of this coal, however, went into ships and barges, and was taken to customers in the Northeast United States. Why? Wouldn’t it have been better, IE., Cheaper, faster, or more efficient to bring this coal to these customers by rail? In some cases a great deal of bituminous coal did go by rail. For example the B&O handed a lot of coal tonnage off to the PRR who then delivered it to customers in the Northeast east. The N&W interchanged some coal tonnage with the PRR in Hagerstown, MD. for eventual delivery to customers in the Northeast....

Ceiling to train room

 I have spent the last 40 years or so in train rooms. I have found that the environments I like best are the ones that are nicely finished. I recently was in one train room that left all the ceiling joists, plumbing, and wiring exposed, BUT, everything from the top of the backdrop up was painted flat black. That room was stunning. Generally basements or train rooms with exposed plumbing, wiring, a/c ducts, etc are not that pleasant. Normally I’m distracted by the operations itself, so this is ALMOST never a deal breaker, but a clean, finished train room environment is much more desirable. When I looked at the ceiling in my basement, well it’s pitiful. I’m supposed to be some sort of professional carpenter, well propmaker anyway, and looking up at that mess makes me sick. So I gave some thought to the ceiling. I didn’t lose sleep, or spend long hours comparing different products, I simply looked up, thought I need something that I can remove so I can make any necessary repairs or im...

Run away, I’m waxing…

 I went to college to become a history teacher, but spent most of my collegiate time looking at a three square foot piece of grass, “Let’s run that again offense!”. I played football. To be more accurate, I played left tackle. BEFORE it was fashionable.  In graduate school I was working on my doctorate in History*, when a dispute between one of my professors and I lead to strongly worded suggestions that I might find a better future in the trades. So I swung a hammer for 32 years in the movie business. Anyway, I made more money*. As so often happens in my writings, I go around the long way to get to the point. I THINK I have the perspective of someone trained in “historiography” when I look at model railroads, and in looking I see that I am sorely lacking. Modelers who follow the prototype are closer to the pure religion of history than those infidels who freelance. I want my layout to be built for operations. I want my op sessions to be fun. I have a background in “Historical...

Flow

 I’m designing the layout. I’m involved in several projects at once. When the weather is good I’m out front working on the front porch. When the weather is bad I get into the basement where I have to frame in walls, do wiring, drywall, and I am contemplating my next big project, T-Bar Ceiling. In addition I have any regular maintenance around the house, and the normal diversions of my attention as directed by my wife. Finally there is the biggest obstacle to my progress, my laziness. But I digress… I’m designing the layout. I have it all planned out, then I submit my drawings to my friends and after their input I must re-design. Almost all of the suggestions for changes are good ones.  This brings us to “flow”. What I mean is the flow of traffic between the layout and Littlerock yard, my main yard. Between Littlerock and the rest of the layout is my passenger depot. The potential of switching the passenger trains MIGHT interfere with the flow of trains and transfers to and fro...

Grain Pier and Del Monte Canning

 Over the past week I was in Minnesota and Wisconsin at Pro Rail and some associated bonus sessions. I came upon two industries that intrigued me. On Jeff Otto’s enormous DMIR layout was a grain pier, and on Ron Copher’s huge layout was Del Monte Canning. I already plan to have a rail to barge coal loading facility on my layout, and I have mentioned my thoughts about a grain loading facility. Jeff Otto’s grain pier would have to be slightly reconfigured to be situated on a river. Jeff currently has his grain pier jutting out into the room, a short peninsula with elevators on each side. No ships or even water is modeled. Each elevator has three tracks adjacent, with a roughly 30 car total capacity. One track is for loading the other two are for storage. Entire cuts are spotted for loading, then pulled, after a time, and replaced by a cut from the storage tracks. Inbound cars go to the storage track. MTY cars are returned to their home road for reloading. If I were to do this on AIR2...