 If you didn’t already know I am absolutely terrified of technology. I have GRUDGINGLY accepted DCC, and I had , I think three tortoise switch machines on my old layout, out of some 350 turnouts*1. I do not like all these layers of technology, one on top of another, or in the case of model layouts, one beneath another. I do not want anything on the layout I cannot fix right away, like during a session. So complex switch panels are out of the question. On AIR2 I am contemplating adding some form of detection to control entry into my two helixes. I’m not worried about a head on collision, but rather a rear end collision.  I asked some friends who are knowledgeable in these things, and as usual… got nowhere.  What precipitated this was I saw a “plug and play”  system on a podcast on YouTube, “Larry Pucket, the DCC Guy” . This system, as demonstrated by Larry, SEEMS to be exactly what I want. But when I asked other modelers, OMG*2 was this a divisive can of worms. This i...

Helpers: Part Five

 What I’ve settled on is an engine change at Little Rock Yard. Eastbound trains out of lower (West) staging will arrive at Little Rock with one (or two) powered units. These weaker power sets will be exchanged for three powered locomotives which should be enough power to move my trains over the layout, surmounting both helix’s. My Helix’s are coming in at four turn 1.37% grades. Not terrible. Coal trains out of Pettigrew will be steam powered. Eastward coal trains will have two 2-8-8-2’s and westward one 2-8-8-2. Westward trains, Passenger, Freight, and Coal will all get weaker power since they are downgrade over their entire length. Westward MTY coal trains will only need one engine, while eastward MTY’s will need two 2-8-8-2’s. I doubt I will balance power during session, instead I’ll re-stage it between sessions. Now, if the process of assigning a third power unit to the consist out of staging is workable I might do this.  We’ll have to see how the new Command Control Syste...

Command Control

 On my previous layout I used CVP’s “Easy DCC” system. It was, in fact VERY easy to install. It’s been over twenty years since I installed it, but pretty sure it took me less than one hour to unbox it and get it installed.  Initially this system had a number of problems. CVP assured me that if I only spent an additional $250 dollars for the upgrade everything would be fine. I was pretty upset that CVP expected me to pay them an additional $250 just to make my DCC system work like it was supposed to. I met with CVP at the 2005 NMRA convention, and wrote them a check for $250.  While I felt black mailed, I think I had paid $3000 for my entire command control system up to that point, once the $250 upgrade was installed my system performed flawlessly. It REALLY did. The only problems I had with it were “Operator Error”, and this was narrowed down to two operators who continuously made errors. So now, after roughly 25 years with Easy DCC and using countless other command contr...

Train room Ceiling.

 I priced T-Bar ceiling for the layout room. We’re painting everything above the scenery flat black instead.

MTY car request procedures

 Filling MTY car requests is a complex procedure. Establishing this procedure is a lot more difficult than I initially thought. A car is spotted at an industry during the January op session. During the February session the car is pulled from that industry and returned to the yard. The car is MTY and wants to go to its home road where it can be reloaded. Simple. Hardly. I don’t even know where to begin this cycle, so let’s assume TWO things happen at the same time.  1a) An MTY car is ready to pick up. 1b) Another industry has a load it needs a car for. Along with this whole MTY car request thing is the desire to TRY to follow car service rules SOMEWHAT. To over simplify, Car Service Rules direct that railroads must TRY to match a load going to Ft. Worth with a car belonging to a railroad based in or near Ft. Worth ( You can insert any city in North America). The gross oversimplification of these rules is “Send it home and keep it home”, that’s the car we’re talking about. ...

Layout Geography: Update

 I think in the first week of my blogging I wrote about the geography of my layout. Additionally I covered my decision to move the modeled portion of my layout to Charleston, WV a year or so later.  I thought after a couple years I’d go over it again. What I mean by layout geography is, “Where in the world is my layout located?”. I think the answer to this question is actually one of the top three or four questions you must answer when building an operations oriented layout. Frankly I cannot, off hand, think of anything more important, even though I’m sure there is something. Where you are determines your traffic plan. Your traffic plan practically dictates everything else you’ll do. What kind of trains will you run? Your car and locomotive fleets. What else? I spent a GREAT deal of time with railroad atlases and determined where my railroad would go; connections to be made; traffic plans; logically what trains I’d be running over my layout. I made a decision that I WANTED a r...

Where did the Coal go, and why? Part 2

 Something I wanted to add to this, in the Steam era it’s important to remember that the Railroads themselves could NOT set rates. A railroad could not charge more if they could get a product somewhere  faster than their competition. They could not charge LESS either.  Of course, as a shipper, you knew it was going to cost you $10 a ton to ship a car load of widgets to Peoria, but Railroad B could get them there two days faster. This might be an inducement. If the All-Rail route saves you the demurrage charges because your widgets are in those cars five days LESS than other routes, than that might be an inducement. If, on the other hand, you could move your widgets to Boston for $8 a ton, but part of the trip was in an inter-coastal freighter that was going to take a week longer, Is the delay going to be a problem ?  If it isn’t,  then that’s the routing you’re going to choose. It’s the way the routes are sewn together. The all-rail route, no matter which way yo...