Posts

Enhancing operations with…: Part 1

 Over the last 15 years Al Daumann and I have been aggressively adding procedures to our respective operations to enhance them. How many of you have, upon the start of the op session, drawn a passenger train? This has nearly universally been a big disappointment to me. I have to say TTTO operations has saved me, in general, in this respect.  The process of negotiating a layout while operating under TTTO rules has brought the fun of just “running a train” back to me. Having said that with the vast majority of passenger train’s on layouts across North America, the process is very dull. You depart and upon arrival at the first station you stand and dwell a specified time. The idea is you are standing and pretending to let passengers on and off. At least with TTTO you compete against a clock. So Al and I looked at this and created passenger tickets. I went to a great deal of trouble, reading Bill Darnaby’s article based on operations at the Batavia MRC.  This is a demand driv...

Blocking in the Steam Era: Part 3

 First let me take a second to wish every one a Happy Thanksgiving. I think the entire gist of Mark’s clinic, as far as blocking goes, is that in the steam era, railroads did not “distant block”. By this I believe he means that no train is built with SPECIFIC blocks destined for locations beyond the division point. Yes there might well be a large block for “Points West”, but not specifically a “Denver” block. Railroads simply pushed cars bound for destinations beyond the next division point IN THAT DIRECTION. If you keep moving cars TOWARD their destinations they eventually get there. I believe traffic in the steam era was subject to delays due to dwell time in yards,  that in more contemporary eras railroads worked hard to eliminate. All this seems obvious, a car goes that way-so send it that way. Now I get to the topic of trains with dedicated purpose. A expedited LCL train or Perishable Produce for example. On the model railroad a train leaves the yard heading for EAST stag...

Blocking in the Steam Era: Part 2

 What I need to discuss with Mark Amfahr is the following.  Your Railroad prepares a train for points East. The next Station East is “B”. In “B” you have several interchanges with other railroads.  When you make up this train do you block cars for these interchanges? Or do you simply create a dogs breakfast and let the next yard pull out all the cars for interchange? Could this be interpreted as some sort of union rule? That is, by blocking the cars for these foreign roads in town “A”, when the train gets to town “B” you have taken the work away from the switch crews in B. -NOW- After speaking with Mark, here is his take on this question. The yard crew at “A” would include the interchange cars into the block for town “B”. At “B” the crews there would break down and classify the block into the cars for local delivery and those cars going to foreign railroads via the interchanges located in town “B”. However, what Mark also implies that the switch crew at “A” would PROBABLY...

Blocking in the Steam Era

 This is in response to a clinic given by Mark Amfahr. If anyone reading this does not know Mark, he has a long history working with the prototype, both nationally and internationally. He is very knowledgable in many aspects of our hobby. So basically what Mark is saying is that in the Steam Era railroads blocked freight trains differently than they do in the diesel era. The blocking procedures were, in large part, dictated by the technology of the times. A Steam engine could only really travel a short distance before it required maintenance, so railroads worked yard to yard. (What follows is a gross simplification) let’s say for example the railroad had a west bound train. It starts in Yard D and travels west. It carries cars for yards C, B, and A.  At C the railroad sends the engine into the round house, the caboose into the caboose track, and yards that train. It pulls out all the cars for C, and adds all the cars for B & A. This train might look like this “B,B,B,A,A,A,...

How to convey information

 Let me start by saying I wish I really knew how to convey information. What I mean is how to convey information to a crew. How I want a job accomplished.  I recently, last night in fact, received an e-mail which contained the YM instructions for a yard on a large model railroad. Thirty-One (31) pages, single spaced. No pictures. For that one job on that huge railroad. (There’s something like 36 other positions on that layout, each, I presume, with equally complicated job briefs). Thirty-one pages?! The next amazing thing was I read them. It was loaded with interesting information.  And it was, in fact, all describing how to operate a rather complex job.  A great deal of thought went into this document. After reading it what I thought didn’t go into it was the fact that who ever takes this job isn’t being paid and isn ‘t going to be working this yard 40 hours a week, 50 weeks a year. Early in the document it notes that the railroad is short of covered hoppers in ceme...

Q&A

 John Barry,  What you are describing is a “stop off car”*. This was used for a myriad of different commodities. What we were discussing was how a shipper could avoid LCL rates by creating regional distribution centers. John Deere would ship a car load of tractors the first 1000 miles to one of their distribution centers, then at that center the LCL lots were loaded and shipped, only costing the RR the LCL rate for the last 150 miles, instead of the LCL rate for 1150 miles. What does this mean for modelers? The modeler needs to build a John Deere distribution center on his layout. This center receives car loads from staging (Representing loads from the John Deere Factory). These might include loads in end door 50’ Automobile boxcars that need to be spotted for end unloading, as well as flat cars of equipment, and car loads of spare parts (The distribution center is also a parts warehouse). Then MTY cars need to be spotted for loading of the LCL shipments going to individual cu...

Regulating unloading cycles

 Some industries on our layouts get switched once every session. Other’s would normally get switched multiple times a session. How can we establish a procedure that facilitates switching an industry multiple times a session, that doesn’t require some sort of outside influence?  What I’m trying to say is how can this procedure start at the beginning of each session, and continue until the end, with out ME (IE., the layout owner) having to flip waybills or somehow generate a new switch list? A system that is non-mechanical or non-electronic.  Currently I’m very interested in multiple car-card boxes. I’m not simply referring to a three box system: Set-Out/Hold/Pic-up. Although, to be honest,  this is simply a variation of that system. I’m looking at a multi box system that regulates the unloading times of cars, and randomly picks cars to be pulled by the next shifts local. I certain I’ve described this system several times before, but you install a number of card boxes,...