General Progress
If I have mentioned it has only been in passing, I am building my house. My Wife, Helena, and I are the ONLY two workers on the project, so it is extremely slow going. COVID has all op sessions canceled, additionally we are managing a health issue concerning Helena’s mother, who lives in Los Angeles, which caused me to cancel out of the only op session invitation I received in MONTHS, because I had to fly to LA.
All my train stuff is still packed, so I do NO modeling. This is, and I am very aware of it, a big mistake. I should have spent all this time working on ANYTHING pertaining to the new layout, literally ANYTHING.
We are getting very close to moving into the new house; it is literally a matter of weeks. When we are in the house I can begin to, at the very least, open boxes and LOOK at my trains!
I have aggressively been buying structure kits with the goal of having a HUGE supply for kitbashing. The newest plans for the layout call for a long, linear, urban scene with a backdrop of structures. So my plan is to build a lot of backdrop buildings that will require switching, but not a great depth of benchwork.
If you are between layouts do WHATEVER it takes to keep working on small modeling projects. Do not do what I did and fall dormant between layouts.
Comments
Post a Comment