Passenger Train Base Consists

 Each train on my layout has a “Base Consist”. That is, what, at the very least, each train has in it when it comes out of staging. This is as true for freight trains as passenger. For example I have several 2nd Class Perishable trains, Train 56 for example, that carries reefers for points east and some for On-layout.

The base consist for train 56 should be 10 PFE reefers for Richmond, and 5 reefers for local delivery; so called “Valley” engines; and a “Huntington Div.” caboose. 

The through reefers get iced at the ice dock in Little Rock, the Local reefers get pulled off and forwarded to their local consignees, the Valley power gets replaced with Mountain Power, and the caboose gets swapped with a Little Rock Div Caboose.

Passenger trains follow this same base consist idea. Engines; head end cars, both through and set-out; and the rest of the train, crafted to provide the service desired.

What I have done is to compile a binder of base consists so that IF someone other than me is building trains during the staging process, they have directions to follow in order to accomplish this task. All they need to do is turn to the correct page in the binder, and they will see what cars, how many, and where in the train, they need to go.

These base consists are the bare minimum each train needs to be. 

These base consists also represents the foundation upon which we can build a bigger train.

So a base consist for train #2 might call for a total of  seven cars, but for various reasons this can be expanded with a head end block of four express reefers, bringing the car count up to 11. These reasons might include Strawberry season, express reefers might be added to eastbound passenger trains. Or before Christmas mail and express shipments rise dramatically, and Train #2 have extra express cars.

Additionally,  if for what ever reason, there are so many additional cars for a particular train that a second section IS required, there’s a page in the binder covering that.

Each “Consist” is footnoted to tell you about set-outs and connections, this way the person building the train will know which waybill to insert in the card pocket.

This binder is not done yet. I still have a great deal of work to do.

Finally it’s in a three ring binder so it’s easy for me to add, subtract, or update trains as we go along.

What are YOUR thoughts about this?


Comments

  1. Paul, its important to also say what DOESN'T go on the train. For instance, number 38 above should not have any cars other than loaded refers and express freight.

    ReplyDelete

Post a Comment

Popular posts from this blog

Yards on a curve

Changing power

Assigning Locomotives