Posts

Coal operations: Dedicated consignees

  After the op session on the LN EK this last weekend Al Daumann forwarded me a scan of the coal routing diagram from the LN EK Div. It illustrates the routing of coal loads from the various points on the layout to their off layout destinations, and it diagrams the routing of the returning MTYS. The main point I picked up was that each mine had a dedicated consignee.  The LN EK lives in 1971. The AIR exists in 1952. It is fairly common knowledge that major industries established mines, or mining companies to insure their supply of coal. Some railroads owned coal companies so their supply of fuel was not hindered. Knowing this would it be plausible to dedicate the entire production of a Tipple to Republic Steel each session, session after session? In 1952, however, there was a much larger residential and light commercial market for coal. These customers were supplied by their local fuel dealers who purchased their stock from brokers. Brokers had a “Rolodex” full of coal tipples...

Transfers: Coal?

 We are not, as a general rule, going to interchange coal on AIR2. Yes some foreign road coal will travel over the AIR to the rail to barge transfer, but most of the coal moving on the layout will be home road coal. But as I have discussed before I hope to allow each operator to regulate their work load through the use of transfers from off layout staging yards. I also hope to utilize this idea for my coal operations. One of the very biggest problems I experienced on AIR1 was imbalances created by the differing skill levels of the crew. One session the coal marshaling yard would be MTY, the next it would be choked. Let’s assume the Pettigrew Yardmaster (PYM) job is chosen by a crewman who has a better that average skill level. He will finish all his work early. Directly adjacent to Pettigrew Yard is a prep plant. If I build a series of “Coal Branches”* that are in reality small staging yards, that feed the prep plant directly, a PYM who has a high through put could tap these branch...

Room Prep: lighting

 My wife and I continually battle over lighting. She pays lip service to rooms having a lot of light, but in reality we live in the dark.  I like light. A LOT OF LIGHT. If there’s a 100 watt bulb in the lamp, I replace it with a 200 watt bulb. I WANT to be able to see.  By accident I found some LED shop lights at Costco. They were cheap and I needed to light up our work space temporarily, while we build our house. I have subsequently found these lights on Amazon in TEN PACKS. Each light is 48” long with a six foot cord and the ability to plug in other lights in a daisy chain. Because they are LED they draw very little amperage (I think 100 watts incandescent is 5.6 watts LED), and they shed A LOT of light. They are not, however, very pretty. Since I have the skills “to build a spaceship out of wood, AND make it fly” I might fabricate some type of covering for these lights to “Pretty them up”. On the other hand they might-could be concealed behind a valance, but my double ...

Room Prep: Flooring

 AIR 2 is slated to occupy the basement in my new house. The existing floor is concrete. Ideally I’d like to have wall to wall carpet with double thick padding, but that option is doubtful. My basement is dry, so far. It is a little over two years old, we have a de-humidifier in there, and it is dry and clean. Having said that I do not think I could sleep nights if I laid carpet directly on that concrete floor. I’d be waiting for that one storm or leak that caused even a minor flood. If I had a blank check I would lay down sleepers, then plywood over that, then carpet padding and carpet over that.  I have not yet received that blank check. I guess it’s still in the mail. I have been considering rubber mats. Then again carpet squares might be a good option. Something that could get pulled up quickly in an emergency.  In another basement I built “Coffer Dams”, pressure treated 2x4’s on their side, heavily caulked and sealed with silicone sealant. Those have lasted for four ...

General Progress

 If I have mentioned it has only been in passing, I am building my house. My Wife, Helena, and I are the ONLY two workers on the project, so it is extremely slow going. COVID has all op sessions canceled, additionally we are managing a health issue concerning Helena’s mother, who lives in Los Angeles, which caused me to cancel out of the only op session invitation I received in MONTHS, because I had to fly to LA. All my train stuff is still packed, so I do NO modeling. This is, and I am very aware of it, a big mistake. I should have spent all this time working on ANYTHING pertaining to the new layout, literally ANYTHING. We are getting very close to moving into the new house; it is literally a matter of weeks. When we are in the house I can begin to, at the very least, open boxes and LOOK at my trains! I have aggressively been buying structure kits with the goal of having a HUGE supply for kitbashing. The newest plans for the layout call for a long, linear, urban scene with a backd...

Coal Operations: coal trains

On AIR 1 a lot of people were encouraging me to put loaded coal trains on the schedule  as 3rd class trains. I resisted this because of the issues with TTTO.  If the train did not depart on time opposing extras would have to clear up, or get helping orders from the DS. If more coal was ready to move than could reasonably be accommodated in one train, does this second train run as an extra, or a following section? If we choose to run it as a following section, the first section must depart with signals, and opposing extras must be made aware of these following sections via train order. Regularly spaced 3rd class trains could be placed on the schedule, every two hours, and coal could move in these trains or in sections of these trains with the correct dispatcher involvement, but it does necessitate quite a bit of order writing.  If you were to annul one of these trains because there was no coal at that time, the annulment could carry over for several sessions, or 12 hours. ...

Coal Operations: Prep Plant Part Two

 Happy Armistice Day! After some investigation what I’m learning is something I seem to be plagued with concerning a lot of industries and procedures I model: timing. I model 1952. Labor was still pretty cheap, but the post war boom was on, and wages were rising. In the 1960’s and 1970’s the United Mine Workers union grew in strength, and through negotiations and strikes miners wages rose.  Before WWII coal companies were able to pay labor for menial “Coal Picking” jobs. These coal pickers worked at tipples on sorting tables, removing impurities, sizing, and grading coal; in short cleaning it.  These tipples loaded coal hoppers with clean coal. By 1952 some of the coal production was run through a prep plant, but most still was cleaned at tipples prior to loading.  As wages rose the hand sorting and cleaning of coal got too expensive for coal companies to continue and coal companies found it was cheaper and more efficient to run their coal through larger dedicated pr...