Posts

Car Fleet

 I’ve got too many cars. There’s a shock, a model railroader who has too many cars. I’m slowly trying to upgrade the fleet. As a general rule I never buy any shake the box cars any more. What I’m building, however, will utilize a lot of cars. My freight house complex for example is going to need rough 200 forty-foot box cars per session. Additionally the grain elevator/flour mill/New World Pasta can probably accommodate another 100 cars. This list goes on. My point is, while I’m upgrading, I’m afraid to dispose of any cars, yet. One other problem associated with new, highly detailed, models of interesting cars is the cost. Two new USRA outside braced wood 40’ boxcars from Rapido were $92. Another argument for shake-the-box cars. Specific car types that I want are another compelling reason to look at new cars. I wanted X-3 tank cars on the layout. The X-3 was the most common tank car of the Steam Era, and it stands to reason you’d see them on my layout. Acid tank cars; chemical tank...

Ideas

 Tom Clancy once wrote (I think) “People wed their ideas more faithfully than their Spouses”.  There are a lot of long held, and popular ideas that, um…,  Stink. A lot of ideas are VERY popular and It seems like everyone follows them. I’m not sure they even know why other than “everyone else does it this way”. Try to convince them that this or that idea is bad and they look at you like you killed their kitten (A discussion about live loads and what a disaster they are nearly led to fisticuffs, and I’m not sure I’m speaking to that person anymore. All I said was “they are a very bad idea” and boom!) I worked with a guy on the movie “The Grinch”, Dave Shauger. He was a tank platoon commander in 1st Desert Storm. He had a great saying about popular ideas and the need to think for yourself. “That’s a great idea! Everyone says so. 78 Million people CAN’t be wrong. Oh wait, what about Nazi Germany?” Maybe saying or just thinking a popular idea is a bad idea is, well… bad? Here’...

Express Reefers

 A couple days ago Al Daumann posed a question about Express Reefers, a series of questions in fact. Where were they loaded? Were loads from freight reefers trans-loaded into express reefers? Did express reefers travel with freight reefers in freight trains? So we looked into this, and posed several questions to the OPSIG* on the question. My supposition was that, in addition to other loading points, express reefers could be loaded in the fields. From there local freights brought them to a passenger depot. This turned out to be, generally untrue. As a general rule express reefers were loaded at packing houses adjacent to passenger terminals, then moved to the passenger train that would forward them on. Other loading points were team tracks, depots, REA facilities.  Loads were NOT hauled from fields in freight reefers and then trans loaded at passenger terminals into express reefers. This additional handling was both unnecessary and damaging to the lading. Delays suffered in lo...

Perishable Trains

 I have a number of “perishable” trains on my schedule.  I think there are three produce trains and two meat trains. All the products these trains carry  are defined by the Atlantic Inland as “perishable”. All these loads travel on “Preferred Movement Waybills”. The Preferred Movement bill is pink, so that at a glance crews will know that “This car is expedited”. A lot of different freight moves on Preferred bills. For example Produce, meat, LCL,  might all get a pink waybill. Livestock does not get these pink bills because there is simply no need. Livestock is the hottest thing there is on a railroad.  Auto parts could be designated as expedited. I have a block of cars from a sub-contractor that travels to Convair Aircraft in Ft.Worth, TX. They contain parts to the B-36, which is being assembled in Ft. Worth. The traffic department might designate ANY load as expedited and worth a Preferred Movement Waybill. And “Worth” is the key word here, since there is an e...

Working pace (Editorial*)

 For thirty-odd years I worked at a job, building stuff. I worked against a clock all the time. I’m institutionalized.  Work fast.  So when I operate my working pace is fast. I do not “tyco”, but I have been accused of that. This comes from dealing with poor running equipment, or poor throttle response: the engine is stalled so turn UP the throttle, then boom! Now let me make something clear. I’m not talking about running trains fast. NO, NO, NO! I’m talking about performing all the assigned tasks of the job, rapidly, efficiently, without stopping to lallygag. My entire point is, I work fast. Faster than a lot of people. I believe I’m efficient too. Additionally I’ve been around, so I think I’m pretty good at this game we call “operations”. So I hate being told to slow down. You slow down, damnit, I’m working at a pace that’s comfortable for me! Recently at one layout several busybodies told me I was running a M&E train too fast. Now I HAD read the train brief, and I ...

Distant Blocking

 On AIR 1 I asked YM’s to just block for the next yard down the line. It was not really THAT sophisticated. Waybills routing cars off layout had four destinations: WEST EAST SOUTH WM That was it.  On AIR 2 I am asking YM’s to block cars to far more “sub-destinations” For example WEST is now broken down to two major sub-categories : St. Louis or Chicago And each of them is broken down further. For example the CHICAGO block is broken into: Cleveland Toledo Detroit Chicago The ST. LOUIS block is similarly broken down. Here’s my conundrum, at a recent clinic Mark Amfahr presented a great deal of prototypical data that suggests  that Steam Era railroads simply blocked cars for the next yard, and the concept of “Distant Blocking” is a product of the 1960’s-1970’s. Admittedly Mark worked for large Western Roads (UP for example) and this information might not be completely true for Eastern roads where the physical plants were vastly different. What I wanted to do on AIR2 was to g...

Utilizing manpower: part one

 I wasn’t sure how to title this. On AIR1 I had a rule, no one could take the same job two sessions in a row unless no one else wanted the job. After some time a couple things happened. First, everyone got cross trained, and second some jobs got taken by the same people over and over again, all the time. I didn’t like the second, but lived with it. I also lived with some positions being taken by people who were not as skilled as others, and often this resulted in issues that effected other parts of the layout. My motivation to do this was that I was very discouraged when I went to other layouts and long time operators were always the “Yardmaster”, or whatever. You had to wait until someone died to get a shot at a good job. As a remedy we drew numbers each session, and #1 chose jobs first, #2 chose second, and so on. I liked this. Some did not. To change it up we would agree to choose in reverse order, that is #20 chose first, #19 chose second, and so on. Because I did not like gett...